LDP Enhancement
(Before) Aerial view of Penchala Toll Plaza on Lebuhraya Damansara-Puchong
(After) Additional staggered toll booth constructed after the toll plaza on Bandar Utama – Kepong bound. This is to ease the evening peak congestion before the toll plaza. Constructed in 2005-2006 at the cost of RM8.5 million.